Phase 4 Construction Gallery

Photos of Phase 4 construction.

Sheet Pile Installation (2019-12-16)

Sheet Pile Installation (2019-12-16)

Temporary Trestle (2020-02-10)

Temporary Trestle (2020-02-10)

Pipe Pile Driving (2019-11-13)

Pipe Pile Driving (2019-11-13)

Pipe Pile Driving Ashley River (2019-10-31)

Pipe Pile Driving Ashley River (2019-10-31)

Pipe Pile Driving Ashley River (2019-12-16)

Pipe Pile Driving Ashley River (2019-12-16)

Pile Driving (2020-02-14)

Pile Driving (2020-02-14)

Pipe Piles (2019-11-19)

Pipe Piles (2019-11-19)

Pipe Pile Driving (2020-01-30)

Pipe Pile Driving (2020-01-30)

Sheet Wall Driving (2019-12-18)

Sheet Wall Driving (2019-12-18)

Pump Station Sheet Pile Wall (2020-01-07)

Pump Station Sheet Pile Wall (2020-01-07)

Sheet Pile Wall (2020-01-08)

Sheet Pile Wall (2020-01-08)

Lockwood Sheet Pile Wall (2020-01-29)

Lockwood Sheet Pile Wall (2020-01-29)

Temporary Trestle Construction (2019-12-10)

Temporary Trestle Construction (2019-12-10)

Pile Driving (2019-10-23)

Pile Driving (2019-10-23)

Pipe Pile Driving (2019-10-30)

Pipe Pile Driving (2019-10-30)