eNEWS SIGNUP
Submit
Stay
Connected
Home
Virtual Tour
Gallery
FAQ
Stay Connected
Phase 3 Construction Gallery
Photos of Phase 3 Construction
Tunnel Intersection (February 2019)
Temporary Support Tunnel-to-Adit Connection (2018 02 27)
Coming St Shaft Forms Aerial
Bottom of Lockwood Dr Shaft
Lockwood Shaft- Aerial
Coming St Shaft Rebar
TBM Descent at Lockwood Shaft
Cannon Shaft Concrete (2019-12-10)
Main Line Tunnel Temporary Support (May 2018)
Shaft Final Lining Formwork (2017 06 28)