Phase 3 Construction Gallery

Photos of Phase 3 Construction

Tunnel Intersection (February 2019)

Tunnel Intersection (February 2019)

Temporary Support Tunnel-to-Adit Connection (2018 02 27)

Temporary Support Tunnel-to-Adit Connection (2018 02 27)

Coming St Shaft Forms Aerial

Coming St Shaft Forms Aerial

Bottom of Lockwood Dr Shaft

Bottom of Lockwood Dr Shaft

Lockwood Shaft- Aerial

Lockwood Shaft- Aerial

Coming St Shaft Rebar

Coming St Shaft Rebar

TBM Descent at Lockwood Shaft

TBM Descent at Lockwood Shaft

Cannon Shaft Concrete (2019-12-10)

Cannon Shaft Concrete (2019-12-10)

Main Line Tunnel Temporary Support (May 2018)

Main Line Tunnel Temporary Support (May 2018)

Shaft Final Lining Formwork (2017 06 28)

Shaft Final Lining Formwork (2017 06 28)